Warehouse Construction

Office Construction

Retail Store Construction

Pavement and Parking Construction

CPWG constructors offer a full-service approach to the customer’s needs.  Having two general contractors provides an ability to do both commercial and residential projects. From the design phase, through the build phase, and to project completion CPWG constructors has the ability to provide the client with the assurance that their project will be completed with the quality they expect, in a timely manner, and within budget.

 
 

Design-Bid-Build

This traditional method is broken into three separate phases 1) Design 2) Bidding; and 3) Construction.  Our blend of General Contractors and in-house Engineers allows us deliver quality service in any or all of the phases.

Design/Build

Our General Contractors use their understanding of the construction process to manage the team. Scheduling and constructability issues are addressed during the design, which saves money through better design choices.

Construction Management

Construction Management allows our clients to implement many of the design-build processes with one of our construction experts as their professional advocate from concept to finish, while keeping the design and construction contracts segregated.

We Recognize That The Final Product Tells The Story

The CPWG Constructors Team

We provide our clients the services they require to complete their project. Our team is experienced in all phases of construction. This allows CPWG constructors to be a better choice for quality construction. As part of the Cribb Philbeck Weaver Group we have access to an engineering team to resolve any civil to structural issues using our in-house staff.

Sheila Tarte, President

President
Sheila Tarte

Jeffrey Earhart, P.E., Vice President

Vice President
Jeffery Earhart

Terry Smith, CBC, Chief Executive Officer

Chief Executive Officer
Terry Smith, CBC

Greg Hass, CGC, General Contractor

General Contractor
Greg Hass, CGC,

GraybaR

32,000 SF Warehouse, Retail Space, and Office Renovation

CPWG Constructors performed the renovation of a 32, 000 SF warehouse for a national electrical distribution company. The project included the fast buildout of 8500 SF of office and retail space. The office design included modular furniture and all safety code requirements. To ensure the warehouse also met compliance with safety regulations a fire alarm, Security System, and fire curtain was installed Custom racking and shelving were designed, installed and tested upon completion of the warehouse.

Warren Webster Community Center

Clubhouse Renovation

CPWG Constructors completed a complete renovation of the Warren Webster Community Center clubhouse for the City of St. Pete Beach.The renovation focused on updating and beautifying the building.  Upgrade renovations included a new ceiling, LED lighting, a new HVAC system, several new doors, and the installation of new low impact windows. Drywall was repaired or replaced as necessary throughout the building. The team added the final touches by giving the interior and exterior of the building a fresh coat of paint

Seahorse Mobile Home Park

Clubhouse Renovation

The CPWG Constructors team assisted the Seahorse owners by performing a renovation of their clubhouse.  The original clubhouse was built in 1965 and needed a little TLC, particularly the kitchen and restrooms. The kitchen was renovated to provide the fully functioning kitchen complete with type 1 hood system. The restrooms were renovated and upgraded to meet the standards of ADA compliance.  The original ceiling tiles were replaced and new fluorescent lights installed. A new manager’s office and storage room were also included in the renovation. With the additional of new AC units, the clubhouse was ready for guests to enjoy.

Largo Mall

Commercial Painting

The Largo Mall is a 577,438 SF commercial shopping center located in the heart of Pinellas County, along bustling Seminole Boulevard. The Constructor team performed a complete pressure washing and  painting of all of the mall storefronts (with the exception of Target and Albertson’s). Our goal was to refresh the mall’s look while minimizing the impact to store owners. The team’s painters used Latex Direct to Metal (DMT) paint applied using airless, electrostatic sprayers. This technique minimizes overspray and delivers a smoother paint finish.  

Winter Park Corner

Replace Sewer Laterals

CPWG Constructors removed and replaced  the sewer laterals of the Winter Park Corner Shopping Center. Winter park corner is a 100,000 SF shopping plaza in the upscale neighborhood of Winter Park, Florida. Our team replaced just over 900 LF of the original 4-inch cast iron pipe with new 6-inch PVC pipe.  Concurrently, the sewer laterals were rerouted to allow for better gravitational flow. The existing 4-inch cleanouts were also replaced with 6-inch cleanouts and then covered with asphalt. To complete the project the team replaced the concrete manhole.

Pets “N” More

East Lake Woodlands

CPWG Constructors was engaged to perform a tenant shell buildout for the Pets “N” More store in the East Lake Woodlands Shopping Center. The team began the project by removing the previous tenant’s fixtures and built-ins The existing restroom was in need of repair and was demolished. After the remnants were cleared away, work the shell buildout began. As part of the design the team was required to perform three structural steel penetrations. Drywall was reinstalled, and the team constructed a drywall demising wall. 

Lake Mary, Florida

Pavement Resurfacing

The Constructors team provided the City of Lake Mary, Florida with support for their resurfacing project. The constructor team provided the City with a construction engineering inspection for the milling and resurfacing project. The project goal was to repair deteriorating pavement that was identified during an ASTM D6433-11 inspection conducted by CPWG Pavement Management inspectors last year.

 

Other Recent CPWG Constructor Projects

The Box Fitness Center, Palms of Carrollwood Mall, Tampa, Florida:   Performed the demolition of damaged drywall and reinstallation of same. Worked parameter drainage. Installed Advanced Drainage Systems (ADS) drain guard with sock and set it in a rock filled drainage.

Title Boxing, Oviedo, Florida:  Prepared the tenant space for client occupancy. Created a demising wall for the tenant and installed tenant selected finishes.

Title Company, East Lake Woods, Oldsmar, Florida:  Our team performed the work necessary to prepare the building for tenant occupancy.

Pylon Sign, East Lake Woodlands, Oldsmar, Florida:  Provided the underground electrical service to the new Pylon sign.

Walden Lake HOA Pool Structure and Deck Renovation, Plant City, Florida: The project included the replacement and repair of various components and approximately 1500 feet of decking.

Walden Lake Retaining Wall Installation, Plant City, Florida:  Built 135 LF of heavy timber retaining wall. Upon completion, the area was backfilled, compacted, graded, and sodded.

Zennergy, Interior Renovation, Tampa, Florida:  The project included the interior renovation six offices and the renovation of the building’s second-floor space.

CPWG Constructors Office, 3918 N. Highland Avenue, Tampa, FL

CPWG Constructors Office

CPWG Constructors Office
3918 N. Highland Avenue
Tampa, FL 33603

Please Contact Us For More Information

Email::

info@cpwgengineering.com

Phone:

813-361-2644

Fax:

813.223.2469

Visit the CPWG Website

W3Schools

cpwg-constructors-logo-color-1076px

CPWG constructors offer a full-service approach to the customer’s needs.  Having two general contractors provides an ability to do both commercial and residential projects. From the design phase, through the build phase, and to project completion CPWG constructors has the ability to provide the client with the assurance that their project will be completed with the quality they expect, in a timely manner, and within budget.